SUMMIT DOUBLE CHAIR (MUELLER/RIBLET) - This 1965 Mueller chair was rebuilt with Riblet Chairs
and grips following a fire. The chair pictured lying on the ground is one of the original Mueller chairs.
This chair has an additional unloading station 200 feet below the summit.
PLATTER PULL (MUELLER) - Built in 1965 by Mueller of Switzerland.
EAST BOWL TRIPLE CHAIR (BORVIG) - This triple which goes 3/4 of the way up the
mountain was added in 1984 to replace the Roebling T-Bar.
J-BAR (HOME MADE) - Built in 1954 this lift was modified from Black's orignal
shovel tow.