CROTCHED, NH - Originally named Onset the mountain was later renamed Bobcat ski area in 1977. In 1981 it was annexed to
the Original Crotched ski area adjacent as Crotched West. The combined resort closed in 1989, The new Crotched Mtn
operates on the site of Crotched West. As for now there are no plans to re-annex the original Crotched section.

CROTCHED ROCKET (GARAVENTA-CTEC) - Originaly constructed in 2000 as the North Peak Express at Ascutney, VT.
Crotched purchased the lift to replace the Summit Quad for the mountain's tenth anniversary of re-opening in 2012.


WEST DOUBLE (HALL) - The only remaining lift from the Crotched West era.


PARK TRIPLE (RIBLET) - Installed in 2003 this quad was purchsed used from Ski Cherokee, VA.


VALLEY QUAD (RIBLET) - Bult in 2003 this quad was purchsed used from Ski Cherokee, VA. It was
called the East Quad when first installed.


FORMER LIFTS

SUMMIT QUAD (RIBLET) - Bult in 2003 this quad was purchsed used from Ski Cherokee, VA. It follows a similar
alignment as the original summit double. The last for pictres show the removal in 2012.


SUMMIT T-BAR (HALL) - Built in 1987, the lift was installed to access upper mountain expert trails. The lift was
originally located where the West Double chair runs but was shorter in length.


SUMMIT DOUBLE (HALL) - Built in 1969, the lift had Rudkin-Wiley bubble chairs, later the bubbles were removed
and regular Hall chairs were installed. The chair pictured in this brochure was not actually the summit chair. It was a
double chair at Windham, NY but a photo was needed for the original brochure.


SUMMIT QUAD (CTEC) - Built in 1987, the lift replaced the orignal Hall summit double.

Pics 19-22 thanks to Ned Bolle, Pics 23-26 thanks to NewEnglandSkier13

counter
statistics